CE- 1008
A.
Remove erection platforms from the tower.
B.
Install davit winches (4) on the vertical members of the first tower section.
C.
Reeve hoist line over the davit sheaves and attach hoisting hooks to antenna
set box.
Figure 2-6. 80-Foot Tower Erection, Sheet 16 of 18
2-36