Figure 2-6. 80-Foot Tower Erection, Sheet 18 of 18.
A. Relocate the grip-strut platforms from the outboard supports to the inside of the tower.
B. Remove the outboard supports and the box-lifting davits.
C. Install two horizontal cable braces in each tower section except top section and base section (see detail D on figure
2-4, sheet 4).
D. Use erection platforms as shown in figure 2-6, sheet 10.
E. Inflate the radome.
F. Install maintenance hoist.
G. Install grounding system at base of the tower as shown in detail C on figure 2-4, sheet 3.
2-38