CE-1008
Figure 2-6. 80-Foot Tower Erection. Sheet 17 of 18.
A. Make sure guys have been properly tensioned at each guy level, then remove all horizontal cable braces and
platforms from inside tower.
B. Carefully hoist box to top of tower by operating all four winches at equal speed.
C. Install box supports (4), then slowly lower the box until it rests firmly on supports.
2-37