TM 11-5985-362-13
(2) ANCHOR POSITION 7 (RIGHT AND LEFT SIDES)
To locate position for right and left anchors using the BACK LAYOUT WIRE and SIDE LAYOUT WIRE (next two
wires on REEL NO. 4) proceed as follows:
Two crewmembers move reeling machine with REEL NO. 4 from behind ANCHOR 6 to RIGHT ANCHOR
POSITION 7.
NOTE
RIGHT and LEFT ANCHOR POSITIONS are approximately 90 degrees and 175 feet (54 m) from the
tower base.
With one crewmember remaining at reeling machine, take the SLEEVE with marker tag 7 and walk directly
toward the TOWER BASE.
Walk 175 feet (54 m) past the TOWER BASE until the BACK LAYOUT WIRE is free of reel.
With third crewmember at TOWER BASE, other two crewmembers move the BACK LAYOUT WIRE side to side
until SLEEVE with marker tag 4 lines up with TOWER BASE centerline.
2-17