TM 11-5985-362-13
Remove covers from transit cases and select two 66 inch anchors, one antenna coupler bar and shovel/pick. Carry
to location selected for installation of ANCHOR 6.
At the chosen location dig a starter hole 12 to 18 inches (30.48 to 45.72 cm) deep with the shovel/pick and place one
of the 66 inch anchors in the hole.
CAUTION
When installing anchor, use extreme care not to bend antenna coupler bar.
Place antenna coupler bar through anchor eye. Using two crewmembers exert a downward pressure on the bar and
rotate clockwise until anchor eye is a maximum of 1.5 feet (.46 m) above ground level.
2-13