TM 11-5985-362-13
Hand tension the center LAYOUT WIRE from ANCHOR 6 to anchor position 1 with one crewmember at each end
(holding SLEEVES with marker tags 6 and 1).
At SLEEVE with marker tag 1, insert point of 66 inch anchor into ground for follow-up installation by assigned
crewmembers.
Two crewmembers hold tension on CENTER LAYOUT WIRE.
Third crewmember positions the TOWER BASE, alining SLEEVE (with marker tag 5) on CENTER LAYOUT WIRE
Using hammer drive four TOWER BASE PINS into the ground until all four pin heads are securely against the
top of tower base.
2-16