TM 11-5985-362-13
NOTE
When unreeling center layout wire, carry one 66 inch anchor with you to use point of anchor to
mark anchor location for crewmembers assigned to anchor installation.
Remove REEL NO. 4 from antenna transit case and with reel on ground, insert AXLE RL-27-(*) through hub
of reel.
Position reeling machine 6 ft. (2 m) behind ANCHOR 6. Place axle with REEL NO. 4 on machine.
Unreel CENTER LAYOUT WIRE in the planned direction of radiation (toward the front) of the antenna until
completely off reel.
2-15