TM 11-5985-362-13
Move reeling machine two tower sections toward TOWER CASE. Position machine facing right side ANCHOR (6).
Repeat above two steps to unreel right and left side steel/rope MIDDLE TOWER GUYS.
Face reeling machine toward ANCHOR 6 (rear of antenna). Completely unreel STAINLESS STEEL TOWER GUY.
Aline guy one foot to the right side of CENTER LAYOUT WIRE to prevent interference with assembly of tower
sections.
Change 1 2-24