TM 11-5985-362-13
Move reeling machine three tower sections toward TOWER BASE. Position reeling machine facing right side
ANCHOR (6). Repeat above two steps to unreel right and left side steel/rope LOWER TOWER GUYS.
Face reeling machine toward ANCHOR 6 (rear of antenna). Completely unreel third steel/rope LOWER TOWER
GUY. Aline guy one foot to the right side of CENTER LAYOUT WIRE to prevent interference with assembly of tower
sections.
Move reeling machine to ANCHOR 6. Remove empty REEL NO. 1 from axle and return to antenna transit case.
Change 1 2-25