TM 32-5895-342-14&P
Table 5-4. Organizational Preventive Maintenance Checks and Services - Continued
D - Daily
M - Monthly
S - Semiannually
B - Biennially
W - Weekly
Q - Quarterly
A - Annually
H - Hours
ITEM
INTERVAL
Item to be
Procedures
Equipment will be reported
NO
DWMQSA
B
H
inspected
Not Ready (Red) if:
5
SHEAVES .
a. Lubricate bushings(figure 5-4).
Lubricant is unavailable.
b. Check sheaves for corrosion, wear, or
Sheaves are damaged and
damage. Remove corrosion, clean and paint
replacements are unavailable.
sheaves, as necessary.
c. Check mounting hardware for wear or
Hardware is badly worn and
looseness. Tighten or replace, as necessary.
replacement is unavailable.
6
a. Check structure for damage or corrosion.
Parts are badly corroded
TOWER
Replace damaged parts, remove corrosion,
or are damaged.
clean and apply rust preventive paint (para.
b. Check for damaged or loose hardware.
Hardware is damaged and
Replace damaged hardware and/or torque
replacement is unavailable.
c. Check for loose cable braces. Tension braces
Cable brace breaks; cable
brace has kinks.
necessary.
WARNING
Immediate corrective action shall be taken if
pier settling is evident. Request assistance
from civil engineers.
d. Check tower piers for settling.
Piers have settled.
5-9