Table 2-2. Tools and Materials Required for Installation
Items
Purpose
Applicable publication
Transit level
Level erection site and concrete piers.
Tripod
Transit level support.
Spirit levels (48- and 78-inch)
Level parts of tower structure.
Measuring tape (100-foot)
Measure lengths of parts.
Tighten bolts properly.
Tighten bolts properly.
Open wire clamps (6 each)
Secure winch cable.
Safety hard hat (1 per person)
Personnel protection.
Safety strap (2 each)
Personnel protection during tower erection.
Ladder (20-foot)
Provide access to tower parts.
Cement
Construct tower piers.
Reinforcement steel
Strengthen concrete tower piers.
Table 2-3. Recommended Torque Values for Galvanized Fastener Hardware
Torque values
Diameter in inches
Hi-strength
Standard
1/4
9 ft-lbs
6 ft-lbs
5/16
17 ft-lbs
11 ft-lbs
3/8
30 ft-lbs
19 ft-lbs
7/16
47 ft-lbs
30 ft-lbs
1/2
69 ft-lbs
45 ft-lbs
9/16
103 ft-lbs
66 ft-lbs
5/8
145 ft4bs
93 ft-lbs
3/4
234 ft4bs
150 ft4bs
7/8
372 ft-lbs
202 ft-lbs
1
551 ft-lbs
300 ft-lbs
2-3