TM 11-5985-362-13
Disconnect SLEEVE with marker tag 3 of SIDE LAYOUT WIRE from CLAMP 3 of CENTER LAYOUT WIRE.
Disconnect the CENTER LAYOUT WIRE from ANTENNA COUPLER MOUNTING BAR.
Disconnect the VERTICAL FEEDLINE from the top of ANTENNA COUPLER.
Loosen and disconnect the VERTICAL FEEDLINE and VERTICAL CATENARY from their pound-in
ANCHORS.
With one crewmember at each end (SLEEVES with marker tag 1 and 6) of CENTER LAYOUT WIRE, rotate
wire back to its original position (parallel to TOWER BASE).
Remove ANTENNA COUPLER, ANTENNA COUPLER BAR and pound-in ANCHORS from VERTICAL
CATENARY, FEEDLINE and store in antenna transit case.
From antenna transit case, two crewmembers each obtain 1 MAIN FEEDLINE WINCH and 1 cable clamp
WRENCH and proceed to ANCHOR 1 and 6.
Attach wire/cable grippers of MAIN FEEDLINE WINCHES at ANCHORS 1 and 6 to MAIN FEEDLINE.
Apply tension (by cranking winches) to MAIN FEEDLINE to allow removal of CABLE CLAMPS.
2-58