TM 11-5985-362-13
Attach front ROPE TENSIONERS of RIGHT and LEFT CATENARIES to new ANCHOR 1.
Attach rear ROPE TENSIONERS of RIGHT and LEFT CATENARIES to their respective new ANCHOR 7.
Attach ROPE TENSIONERS of BACK RADIATOR GUYS to their respective new ANCHOR 7.
Fully tension MAIN FEEDLINE with MAIN FEEDLINE WINCHES, making sure TOWER IS kept vertical.
Tension ROPE TENSIONERS of RIGHT and LEFT CATENARIES and BACK RADIATOR GUYS to remove
any slack in MAIN RADIATOR.
Using cable clamp WRENCH, clamp and tighten the MAIN FEEDLINE (front and rear) to new ANCHOR 1
and 6.
Remove MAIN FEEDLINE WINCHES and return to antenna transit case for storage.
Position and anchor VERTICAL FEEDLINE and VERTICAL CATENARY using extra pound-in ANCHORS.
(Refer to page 2-46 for installation procedure).
Tighten VERTICAL FEEDLINE and VERTICAL CATENARY at ANCHORS so that tension is applied to
VERTICAL RADIATOR.
At old location remove ANTENNA COUPLER from ANTENNA COUPLER BAR.
Remove ANTENNA COUPLER BAR from ground and relocate to new VERTICAL FEEDLINE location.
CAUTION
Do NOT mount ANTENNA COUPLER BAR prior to installation of the bar. Pounding on
the bar with coupler attached will break the coupler.
2-55