TB 11-5820-1148-10
5.13 THE OTHER SIDE OF THE ANTENNA
Process Is Paralleled. The installation of this side of the antenna will vary in that the antenna elements
are walked out around the close outer guy stake and inside the outer guy stake. The antenna element
end points will be approximately inline with the unbent side. During hoisting of the balun, the second
person will guide the antenna elements and balun with the coaxial cable.
5.14 ATTACH COAXIAL CABLE
Attach the 50-foot piece of coaxial cable to the bottom of the balun leaving a 6 - 8 inch loop of cable
and connect the free end of the strain relief to the cup hook on the balun. Attach all of the snap links to
the balun bow shackles. Keep snap links on the same side of the balun as the wires.
NOTE
Ensure that the strain relief is supporting the cable
NOT the cable connector.
1-22