TM 32-5985-343-14&P
removing two bolts (13), nuts (4), lockwashers (5), and
(3) Detach two track angles (20) from long
square beveled washers (6).
track brace (24) and two track angles (20) from channel
support assembly No. 1 (26) by removing four bolts (11),
(11) Detach scaffold support plate (2) from
channel support assemblies Nos. 2 (21) and 3 (30) by
(19).
removing remaining four bolts (3), nuts (4), lockwashers
(5), and square beveled washers (6).
m. Tower Adapter.
(12) Detach two channel tie plates (24) from
(1) Remove tower parts necessary before
channel support assemblies Nos. 1 (26), 2 (21), and 3
(30) by removing eight bolts (13), nuts (4), lockwashers
(5), and square beveled washers (6).
(2) Remove
scaffold
winch
assembly
(13) Detach channel support assemblies Nos.
1 (26), 2 (21), and 3 (30) from tower legs A (18), B (28),
and C (22) by removing six bolts (13), nuts (4),
lockwashers (5), and square beveled washers (6) and
assemblies (12) are attached, detach them by removing
nut (13), lockwasher (14), and square beveled washer
n. Tower Section No. 4. A 1-ton winch truck is
(15). If vertical elevator tracks are attached, detach
channel support assembly No. 1 (26) from top track
unless otherwise indicated and take all applicable
assemblies Nos. 1 (22) and 2 (25) by removing eight
precautions.
(1) First, do the following:
brace (29) from two channel support angles (20) by
(a) Remove all parts necessary before
removing eight bolts (17), nuts (9), and lockwashers
(10). Detach channel support angles (20) from channel
support assemblies Nos. 2 (21) and 3 (30) by removing
(5) Detach short track brace (31) from two
(c) Remove tower adapter (paragraph 5-
channel support angles (20) by removing eight bolts
(6) Detach four scaffold reinforcing plates
(19) from scaffold hinge assemblies Nos. 1 (32) and 2
(a) Attach multiple-leg sling assembly
(14) and channel support assemblies Nos. 2 (21) and 3
to tower legs B and C at bottom of tower section No. 3 in
(30) by removing eight bolts (8), nuts (9), lockwashers
(10), and square beveled washers (11).
(b) Attach one end of erection cable to
(7) Detach four corner plates (12) from
snatch block and the other end of the cable to multiple-
scaffold hinge assemblies Nos. 1 (32) and 2 (14) and
leg sling assembly.
scaffold support channels Nos. 1 (1) and 2 (7) by
(c) Engage tower hoist cable with
snatch block and attach this cable to eye bolt in hoist
square beveled washers (11).
(8) Detach channel support angles (20) and
scaffold hinge assemblies Nos. 1 (1) and 2 (7) from
channel support assemblies Nos. 2 (21) and 3 (30) by
that erection cable rides in cable slot at top of gin pole
removing eight bolts (8), nuts (9), and lockwashers (10).
before starting to raise tower. Remove supporting
(9) Detach scaffold support braces Nos. 1
blocks and place them under legs B and C of tower
(15) and 2 (16) from scaffold support channels Nos. 1
section No. 3, 1 foot 6 inches from top of leg
(1) and 2 (7) and from plate welded on tower leg A (18)
assemblies. Do not lower tower yet.
by removing four bolts (17), nuts (9), and lockwashers
(4) Attach cable from winch truck to leg A of
(10).
tower section No. 4.
(10) Unfasten scaffold support channels Nos. 1
(5) Detach tower section No. 4 by removing
(1) and 2 (7) from scaffold support plate (2) by removing
(6) With winch truck, lower tower section No.
beveled washers (6). Detach scaffold support channels
4 to ground. With tower hoist, lower rest of tower onto
Nos. 1 (1) and 2 (7) from plates welded on channel
supporting blocks.
support assemblies Nos. 2 (21) and 3 (30) by
5-21