CE- 1008
A. Lift section until it is approximately six inches under the top cross bar
of davit. (Section must be carefully guided with tag lines during the
lifting operation. )
B. Swing davit and section over base section.
Figure 2-6. 80-Foot Tower Erection, Sheet 8 of 18
2-28