TB 11-5820-1148-10
4.5
ADD GUY ROPES 2ND
Attach the fixed end snap link (brown) to the top (brown) stay plate 120-degree holes. Walk out to the
far guy stake, reeling extra line off until the end of the rope appears, then snap the tensioner end
(running end) onto the upper hole of the second, or farthest stake from the mast.
4.6
ADD GUY ROPES 3RD
Repeat this procedure for the remaining two guy lanes of the mast. Ensure that all guy line tension
adjusters are fully backed off. This ensures enough slack in the guy lines to fully extend the mast without
having to stop and adjust the guy ropes.
1-12