TM 11-6625-1702-12
SHIPMENT AND LIMITED STORAGE
5-1. Disassembly of
Equipment
bers of materials, refer to SB 38-100.
Prepare the equipment for shipment and stor-
Dimensions (in. )
age as follows:
Material
Qty
Length Width
Height
a. Disconnect all the test equipment, the
Polystyrene corner 8
5
5
5
3
blocks (bearing
3
3
u n i t under test, and all the cables from the
surf ace ).
TS-2642/ARM-l15.
22
1
29
11
Water-resistant,
corrugated,
b. Place the cables in the cover, and the
double-wall,
radome in the test set case.
fiberboard box
168
1
1
Pressure-sensitive
c. S e t t h e T S - 2 6 4 2 / A R M - l 1 5 M E T E R
f i l a m e n t tape
FUNCTION switch to OFF. In the OFF posi-
PPP-T-97 type 4.
t i o n , the switch shorts the meter movement
216
3
Pressure-sensitive,
1
which provides damping and prevents possible
water-resistant
d a m a g e from physical shock. Set the MAN-
tape PPP-T-76.
4 units
D e s i c c a n t (1 bag)
UAL TUNE switch to OFF.
Nets. The dimensions shown for the box are inside dimensions.
d. If the TS-2642/ARM-l15 is not within
b . Packaging. Package the antenna test set
the test set case, install the TS-2642/ARM-l15
as outlined below.
in the test set case and tighten the fasteners.
(1) Place four units of desiccant in
e. Replace and fasten the test set cover.
c a r r y i n g case.
(2) Place one polystyrene corner block in
5-2. Repackaging for Shipment or
each of the four bottom corners of the fiber-
limited Storage
board box.
T h e exact procedure for repackaging depends
( 3 ) Place the AN/ARM-115 in the fiber-
upon the material available and the conditions
board box; position it on the four corner
under which the equipment is to be stored or
blocks.
shipped. Adapt the procedures outlined below
w h e n e v e r circumstances permit. The informa-
(4) Place one polystyrene corner block in
t i o n concerning the original packaging (para
e a c h of the four upper corners of the fiber-
2-1 ) will also be helpful.
b o a r d box.
a. Material Requirements. T h e f o l l o w i n g
(5) Secure the fiberboard box with pres-
materials are required for packaging the equip-
Change 3