CE-1008
B. CHECK AND ADJUSTMENT - When the Antenna System is installed and operating, check the boresight as
follows:
(2) Acquire the r-f signal generator with the Antenna System and note the azimuth indication on the Control
Indicator.
(3) Subtract the indicated azimuth from the azimuth surveyed in step A(3).
(4) Set the AZ ORIENT control on the Antenna Control Power Supply to the algebraic difference determined in
step B(3).
(5) Repeat steps B(2) and B(3) to check boresight.
10. EQUIPMENT RELOCATION
A. Procedures for stowing and relocating the Antenna System are essentially the reverse of installation procedures
given in this section.
B. See paragraph 7 for special procedures applicable to stowing the 80-foot tower.
C. See Figure 2-9 for configuration of the Antenna System in the stowed position.
2-45