TM 11-5985-362-13
Refer to page 2-6 and use CABLE CLAMPS to attach ends of MAIN FEEDLINE and STAINLESS STEEL
TOWER GUY. When they are securely clamped, remove all winches and return to antenna transit cases for
storage.
Adjust tension in TOWER GUYS, MAIN FEEDLINE and CATENARIES so that TOWER remains as vertical
as possible.
Locate the VERTICAL FEEDLINE and the VERTICAL CATENARY directly under the ,MAIN FEEDLINE.
Anchor both with POUND-IN ANCHORS so that tension is in the VERTICAL RADIATOR.
CAUTION
DO NOT mount ANTENNA COUPLER to ANTENNA COUPLER BAR prior to installation
of the bar. Pounding on the bar with coupler attached will break the coupler.
Using hammer, drive ANTENNA COUPLER BAR into the ground.
Mount the ANTENNA COUPLER onto the ANTENNA COUPLER BAR as shown.
Connect the VERTICAL FEEDLINE to the coupler.
Connect the CENTER LAYOUT WIRE to the bar with the loop of wire between CLAMP 3 and CLAMP 4.
Tighten wingnuts securely at the ANTENNA COUPLER and CENTER LAYOUT WIRE.
2-48